Casinos Not On GamstopBetting SitesNon Gamstop CasinoUK Online Casinos Not On GamstopUK Casino Sites Not On Gamstop
General > refurb.html
Fullwell Cross Refurbishment Phase II
Advance Notice


The London Borough of Redbridge and Vision – Redbridge Culture and Leisure Trust are pleased to advise you that the proposed second phase refurbishment project is set to commence shortly. Alongside this refurbishment, Vision has successfully secured funding to develop the existing cafeteria into a new “state of the art” gym, which will replace the existing gym on the ground floor.

There will be no disruptions to usage of the swimming pool throughout the London Borough of Redbridge and Vision works periods and the current swimming programme will continue unaltered.

The London Borough of Redbridge Phase II project encompasses the re-modelling of the foyer area; refurbishment and improvements to the current Vapour Suite, transforming the area into a modern Spa facility; relocating the cafeteria to an area adjoining the Spa; refurbishment of the first floor toilets; installation of a lift for disabled users to the first floor and other works to improve access for disabled users. The Phase II development works will commence on Monday 2nd March, 2009 and the Vapour Suite will be closed throughout these works, which are scheduled for completion at the end of June.

The work on the Vision Gym Development Project is scheduled to start in late February and therefore the current cafeteria will be closed when this work commences. There is currently no planned closure of the existing gym as the aim is to transfer the gym operation to the new first floor location when the Vision works are completed, however if any closure of the gym is necessary, advance notice will be given to customers.

The Dance Studio will unfortunately be out of use for up to 3 weeks during the London Borough of Redbridge works. Vision will work closely with the London Borough of Redbridge in order to re-programme the existing Dance Studio timetable, where possible, to other areas within Fullwell Cross and/or other Vision facilities during this period.

More information regarding the Dance Studio Programme as well as further detail on the Vision and London Borough of Redbridge projects will follow. Display Boards will shortly be erected in the Fullwell Cross Foyer as part of this process.

If you need any further information on the London Borough of Redbridge project please
feel free to contact: -

Kevin O'Brien
Facilities & Swimming Development Manager
Culture, Sport & Community Learning
London Borough of Redbridge
Lynton House, 255-259 High Road, Ilford, Essex IG1 1NY
Email:- [email protected]

Click HERE to see images of proposed spa area

Frequently Asked Questions about the refurbishment and Spa
Copyright ©2008 Vision.
All Rights Reserved.
This website is powered by Britnett Web Services

Best of the web